All manuals and user guides at all-guides.com
3. Before you start...
Unpacking
– Remove the packaging, although leave the display head attached to the column. Place
the scale platform on a solid, flat surface.
The scope of supply includes:
• Side section with two columns and the
display head attached for transport
• Side section with one column
• Scale platform
• Railing
• Cover for the wheel casing
• Cover for the side casing
• 2 triangular covers right/left
• Display mount
• Set of assembly bolts
• Allan key, size 6
• Phillips screwdriver size 1 and size 3
• 1 screwdriver
• 1 seca mains unit
• 1 set of operating instructions
Model 645
GB
25