Télécharger Imprimer la page

salmson Prima Waste Installation Et Mise En Service page 9

Publicité

Les langues disponibles

Les langues disponibles

ENGLISH
4.4 The motor
Monophase: thermal protection with an integrated probe,
automatic reset, delivered with electric cable - length 10 m with a
CEI 23-5 plug and float switch.
Integrated condenser.
Technical data
Mains voltage
Mains frequency
Protection class
Insulation class
Speed
Max. current consumption
Power consumption P1
Max. flow rate.
Max. delivery head.
Operating mode S1
Operating mode S3
(optimum)
Recommended switching
frequency
Free ball passage
Nominal diameter of
the pressure port
dmissible fluid
temperature
Max. submersion depth
Flat suction up to
Maximum fluid density
4.5 ccessories (optional)
• Isolating valve • Ball check valve • Float switch NIVO • udible
overflow signal L RMSON • Control box • Lifting chain ...
The use of new accessories is recommended.
5. INST LL TION
5.1 Electric connections
The electrical connections and inspection should be made
by a qualified electrician and comply with the standards in
force.
Make sure that the electric installation is in compliance with the
standard IEC 364 and that the line power supply has a high-
sensitivity earth fault breaker (max. 30 m ).
The electrical connections have to be done before the pump is
lowered into the sump.
Check that the type, voltage and frequency of the electric line
power supply complies with the indications mentioned on the name
plate.
The pump is delivered with a 3 wires cable equipped with a
standardised plug (2 poles + earth). Connect obligatory the cable
on a socket with 2 pole + earth.
1~230 V, ± 10 %
50 Hz
IP68
155
2 900 rpm (50 Hz)
See name plate
See name plate
See name plate
See name plate
200 operating hours a year
Intermittent duty, 25 %
(2.5 min. operation, 7.5 min.
interval).
20/h
Ø20 mm
Ø40 mm (R 1"1/2),
threaded bend Rp 1"1/2
+3 to 35 °C
5 m
40 mm
1060 kg/m3
5.2 Installation (See FIG. 1)
Installation of a pump with monophase motor, float switch and
optional overflow audible signal.
The sump should be of ample size, so that the motor does not start
too often.
They operate automatically, when the float switch switches the
pump on from a certain water level "h" and switches it off at a
minimum water level "h1".
In manual mode (float switch in vertical position), the minimal
residual level is "h2".
Installation dimension / shaft dimensions
h max.
h1 min.
430 mm
180 mm
C UTION!
- In continuous service : h1 min. = 240 mm
- Lower the pump into the sump using a chain (or a cable) hooked
to the handle, never by its power cable.
- Take care not to damage the power cable of the motor during the
going down in the sump.
-
void placing the regulators near the outlet of the pipe through
which the water enters the sump, since this could mover them.
- Keep the lowest regulator away from the pump suction port so that
it will not be sucked in.
- If the installation is outside protect the discharge pipes, the
isolating and check valve, and the electric controls from frost.
5.3 Hydraulic connections
Discharge pipe 40/49 (1" 1/2).
The ball check valve must be connected to the upper side of the
discharge pipe before the full bore isolation valve.
Provide a 4 mm diameter hole on the discharge pipe (See FIG. 1 -
item
) before the check valve for a possible venting following a
draining.
6. ST RTING
6.1 Filling - Degassing
- Fill up the sump.
- Check that the float switch or the level regulators operate freely.
6.2 Starting
- Make sure that the sump is full of water.
The pump must never run dry.
- Open the discharge valve,
- Start the pump.
The functioning is now controlled automatically by the float switch or
the level regulators.
7. SERVICING
No special servicing while the pump runs but cleaning the impeller
or the strainer can be necessary.
TTENTION! Before any intervention disconnect the pump.
9
h2 min.
B min.
40 mm
450 x 450 mm

Publicité