Télécharger Imprimer la page

Riello F10 Instructions Pour Installation, Utilisation Et Entretien page 12

Publicité

Les langues disponibles

Les langues disponibles

TWO LINE (LIFT SYSTEM)
A) If a two-line system is required, install the By-pass plug provided. The by-pass plug is installed in the return port
of the pump. A 2.5-mm hexagonal key provided with the by-pass plug is to be used to install the plug.
DO NOT use an inch size hexagonal key; damage to the by-pass plug may result.
When operating on a two-line system, supply and return lines should be the same diameter and both should
extend to the same depth inside the fuel tank. Be sure there are no air leaks or blockages in the piping sys-
tem. Any obstructions in the return line will cause failure of the pump shaft seal.
2 LINE (LIFT) SYSTEM-PIPE LENGTHS
H
3/8" OD
FT
M
FT
0.0
0.0
115
1.5
0.5
100
3.0
1.0
80
5.0
1.5
65
6.5
2.0
50
9.5
3.0
25
11
3.5
20
To install the by-pass plug:
1) Remove the return plug (7).
2) Install the by-pass plug (4) using the 2.5 mm hexagonal key.
B) Attach the two PIPE CONNECTORS (6) to the pump SUPPLY and pump RETURN PORTS (5 and 7). Attach the re-
quired piping to these two pipe connectors using the NPT/ METRIC ADAPTERS that are supplied with the burner.
- Pipe dope or Teflon tapes are NOT to be used on any direct oil connection to the fuel pump.
- The height 'P' in Pipe Length Charts should not exceed 13 feet (4 m).
- The vacuum should not exceed 11.44 inches of mercury.
WARNING
IMPORTANT:
An external, appropriately listed and certified oil filter must be placed in the fuel line between the
fuel tank and the burner pump.
PUMP PURGE
NOTE: To protect the pump gears, it is advisable to lubricate the pump prior
to purging a lift system. Apply oil through the VACUUM PORT (C).
A) SINGLE LINE (GRAVITY FEED SYSTEM)
I. Loosen the bleeder valve (A) until oil flows out. Tighten the bleeder valve
securely and startburner.
II. When bleeding the pump by pressure:
1) Loosen the bleeder valve (A).
2) Disconnect nozzle oil supply line at the pump nozzleport (B).
3) Attach a flexible plastic tube to the pump nozzle, port directing the oil
flow into a bucket.
4) Loosen the screw(s) securing the air tube cover, allowing it to be re-
moved freely.
5) Holding the air tube cover in its proper location start the burner.
6) When the solenoid valve is engaged approximately 10 seconds after
starting, remove the air tube cover and shine a light source on the
photocell, allowing it to see false light.
2903377
All manuals and user guides at all-guides.com
1/2" OD
M
FT
M
35
330
100
30
330
100
25
330
100
20
295
90
15
230
70
8
100
30
6
65
20
ATTENTION:
do not exceed
pipe lengths
indicated in chart!
9
B
D7284
GB
D6008
C
A

Publicité

loading

Ce manuel est également adapté pour:

F15260t250t308305830830593083060