Notes for installer
Setting up the rotary iron
Dismantle the mounting flaps on the left
and right sides.
Check the roller and front and outside of
the side columns using a level.
Align the machine using the screw-on feet
in such a way that the side columns and
roller are level with each other. In the
process, the feet may be unscrewed a
maximum of 60 mm (approx. 2 3/8").
Counter the screw-on feet according to
the alignment using the nuts (under the
side columns).
Mounting the base (optional)
Mounting the optionally available base can
raise the machine by 100 mm (approx.
3 15/16").
Dismantle the mounting flaps on the left
and right sides.
Unscrew the screw-on feet by the maxi‐
mum amount (> 60mm (approx. 2 3/8")).
Hold the side columns with a suitable aid
and remove the screw-on feet.
Mount the screw-on feet into the base and
push the base under the column.
Screw the base to the base plate of the
machine.
Install the laundry box on the laun‐
dry outfeed table.
During installation, bring the laundry box
into a horizontal position.
Loosen the fastening screws of the laun‐
dry box.
Rotate the laundry box by 180° and mount
with the fastening screws on the laundry
outfeed table.
4
Duct for vapour extraction
 The exhaust air ducting to be laid on-
site must not be channelled into a chim‐
ney or flue already in use for any gas-,
coal- or oil-burning installation. It must al‐
so be laid separately to any exhaust air
duct used for a laundry dryer.
The moist-warm air is to be conducted out‐
side or to a suitable venting duct over the
shortest path possible. Due to the higher air
velocity, the exhaust duct must be laid in
such a way that the air flow is not hindered
(few bends, short lines, well-made connec‐
tions and transitions). Filters and louvers
may not be installed into the exhaust duct.
Since the relative humidity can amount to
up to 100%, suitable measures must be
taken to prevent condensate from flowing
back into the machine. If the machine fan is
not powerful enough to remove the moist
air, a suitably powerful additional fan must
be installed in the shaft or roof outlet on-
site. Supply air must be provided to the
room of installation according to the amount
of exhaust air.
– The connection for the exhaust air duct
for vapour extraction (not available for PM
1210) is located on the rear of the left side
column and has a diameter of 70mm
(2 3/4").
– The exhaust air duct must have an internal
diameter of 70mm (2 3/4").
– With an exhaust air duct leading upwards,
a condensate drain hole (ø 3-5mm
(1/8"-3/16")) must be provided at the low‐
est point to drain the water.
– Adequate ventilation of the installation
room must be ensured.
– The on-site exhaust air duct and exit point
to the outside must be regularly checked
for lint deposits and cleaned if necessary.
– The end of the air duct leading into the
open should be protected against the ele‐
ments (e.g. by a downward angle of 90°).