Télécharger Imprimer la page

Lenze EMB934 Serie Manuel D'instructions page 129

Publicité

Les langues disponibles

Les langues disponibles

6
Commissioning
6.1
First switch-on
Stop!
ƒ
ƒ
1. If 935x brake choppers are integrated into the drive system:
– Ensure the mains supply is switched-off.
– Use switches S1 and S2 to adapt the 935x brake chopper to the mains voltage (see
documentation for the brake chopper).
2. Switch on the mains.
– The drive system will be ready for operation after approx. 0.5 s.
3. Control the readiness for operation via both LEDs at the front of the regenerative
power supply module:
Status
green
red
on
off
off
on
off
off
4. Adapt all controllers which are connected to the drive system to the mains voltage
(under C0173).
EDBMB9340 DE/EN/FR 9.0
Prior to initial switch-on check the completeness, polarity, short circuit and
earth fault of the drive system wiring.
Keep to the switch-on sequence!
Description
p
The regenerative power supply module is connected to the mains voltage and is ready for
operation.
No faults.
Active fault
Mains voltage is switched off
Mains phase L2 or L3 failed
Commissioning
First switch-on
6
129

Publicité

loading

Ce manuel est également adapté pour:

Emb9341Emb9342Emb9343