5
Electrical installation
Circuit proposals
Controlled shutdown of the drive system
5.5.2
Controlled shutdown of the drive system
For controlled shutdown of the drive network additional 935X brake choppers have to be
installed in the network.
The same circuit principle can be used if more braking energy than permissible in the
feedback operation is to be dissipated.
Stop!
The regenerative power supply module may be destroyed if the feedback
operation of the regenerative power supply module and the brake chopper are
active at the same time.
For this reason, the circuit must be arranged so that the feedback operation
will be inhibited when the DC-bus voltage reaches impermissible values.
L1
L2
L3
L3' L2' L1' L3.2 L2.2 L1.2
Fig.13-14
126
F4
F5
PE
L1
L2
L3
+UG
-UG
934x
E1 39 A1 A2 59
PE U V W
K10
+
24 V DC
=
_
FAIL
Z4
Circuit proposal - controlled shutdown of the drive system
934X
Regenerative power supply module
Z2.1 ... Z2.n
Controllers in the drive system
935x
Brake chopper with brake resistor
Z4
Higher-level control (PLC, PC)
K10
Signalling relay "DC bus voltage too high"
F4...F9
DC-bus fuses
F6
F7
PE
L1
L2
+UG
-UG
+UG -UG
935x
Z2.1
28
Ex
39
59
Ax
PE U V W
K10
F8
F9
L3
PE
+UG
-UG
+UG -UG
935x
Z2.n
28
Ex
39
59
Ax
9340vrm009
EDBMB9340 DE/EN/FR 9.0