Gas Control Valve Replacement Kit Overview
Before proceeding with the ETi
replacement kit, please verify that you have all the items listed as shown below in the
Required Tools.
Required Tools
(not included in kit)
You will need the following tools and instruments for this conversion:
1 5/16" socket wrench or nut driver
1 T20 bit Torx screw driver
1 Channel locks
1 Adjustable wrench, 2-1/2" Capacity
1 Adjustable wrench, 1-1/2" Capacity
1 Flat Blade Screwdriver
1 1/8" NPT barbed fittings
1 Pipe Sealant approved for use with natural gas or Propane
1 Pressure gauge or manometer with range to 14" W.C. (High Pressure
Gauge)
1 Differential pressure gauge or slope gauge (inclined manometer) capable
of reading to a resolution of 0.05" W.C. (Low Pressure Gauge)
1 Flue-gas analyzer reading CO2 (optional)
Note: Do not attempt the heater conversion without all the listed tools shown
above.
Gas Connections
Failure to follow instructions could result in fire or explosion with serious injury or
property damage. This combustion blower replacement kit is to be installed by a
Sta-Rite
and/or Pentair Water Pool and Spa ("Pentair") distributor or other qualified
®
agency in accordance with the manufacturer's instructions and all codes and require-
ments of the authority having jurisdiction. The qualified agency performing this work
assumes responsibility for this replacement. The term "qualified agency" means any
individual, firm, corporation or company which either in person or through a repre-
sentative is engaged in and is responsible for (a) the installation or replacement of
gas piping or (b) the connection, installation, repair,
or servicing of equipment, who is experienced in such work, familiar with all precau-
tions required, and has complied with all the requirements of the authority having
jurisdiction.
400 High Efficiency Heater Gas Control Valve
®
ETi 400 High Efficiency Heater Gas Control Valve Replacement Kit Installation Guide
5