Servicing Procedure - Pentair ETi 400 Guide D'installation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Servicing Procedure

The Gas Control Valve is located at the bottom of the gas train and can be accessed
by the manifold service panel. See figure 1.
1.
Turn off the electrical supply to the heater.
2.
Turn off the pump.
3. Turn OFF the
manual gas supply
valve to the heater.
4. Remove the water
manifold service
panel. Using a
flat-blade
screwdriver, insert
press and turn
the screwdriver to
unlock the panel.
5. Disconnect and discard the plastic tubing from the gas control valve "VENT"
port.
6. Disconnect and discard the tubing between the blower, and the air flow switch
and install the new plastic tubing (provided in the kit).
7. Unscrew completely the union nearest to the gas valve on both sides
8. Remove the gas piping from the old valve and install it in the new valve. Use
thread sealant approved for natural gas and Lp gas.
9. Replace the Gas Control Valve by screwing the union on both sides of the gas
valve.
10. Connect the plastic tubing to the
11. Turn on the manual gas supply valve to the heater.
12. Turn on the pump and the electric power to the heater.
13. Test for gas leaks with a soapy water solution.
Table 2. Flue Gas CO2 and O2 Ranges
Fuel
NG
Propane
OUTLET
HEATER
TO
POOL
Figure 1.
Vent Port
Recommended CO
(Dry Basis)
7.80% – 9.2%
9.6% – 10.2%
ETi 400 High Efficiency Heater Gas Control Valve Replacement Kit Installation Guide
Panel latch lock
INLET
FROM
FILTER
FILTER
MANUAL
BY-PASS
GATE
VALVE
at the Gas Control Valve.
2
7
PUMP
FROM
POOL

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

476001

Table des Matières