Specifications; Parts List - Pentair ETi 400 Guide D'installation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Gas Pressure Setting Verification
11. If the pressure is within the limits given in step 10, the gas pressure is at the
optimum level. Reconnect the plastic hose between the GAS VALVE VENT
TOP and the BLOWER MIXER INLET.
12. Remove the 1/8" NPT barbed fitting from the PRESSURE TAP port on the
outlet side of the gas valve and reinstall the plug. Be sure it is tightened
properly. Turn OFF the heater and manual gas supply valve.
13. Run the heater continuously for at least 10 minutes, then insert a
combustion analyzer probe into the exhaust and measure the CO2 level. The
recommended CO2 ranges for natural gas and propane are listed in Table 2,
on page 8. Preferably, the readings should be in the midrange.
14. Replace the water manifold service panel. See Figure 1 on page 7.
Sp
p
p
ec
c
c
ific
c
c
atio
o
o
ns
s
s
Inlet Pressure:
Min./Max:
Manifold Pressure:
Reference to Blower inlet tap:
Required Gas Input (BTU/Hr):
Model: ETi
400 High Efficiency Heater
®
Parts List for Gas Control Valve Kit P/N 476001
Description
Gas Valve Kit
Elbow taped 1/8 mpt x 1/4 ID
Tubing PVC 0.25 ID x 0.375 in OD x 7.5 in
Tubing PVC 0.25 ID x 0.375 in OD x 15.5 in
Gas Control Valve
Label Kit MT
1/4 in Tee Fitting
Installation Guide, Heater Gas Control Valve
4" / 12" WC
-0.2" WC
399.990 BTU/Hr
ETi 400 High Efficiency Heater Gas Control Valve Replacement Kit Installation Guide
(Continued)
Qty.
1
1
1
1
1
1
1
1
P/N
467001
33202-0656T
475845
475847
42001-0051
472585
475850
476111
9

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

476001

Table des Matières