Fig. 25
Fasten the upper unit to the base using the fixing
screws. (Fig. 25, page 23).
Pay attention to the fixing. Tightening
torque: 4.5Nm (±0.2Nm).
Put some thread-locker into the holes for
screws (Loctite 222®).
To avoid scratching the product with the hexagonal
wrench, align the body of the product with the screw
to screw in.
MNVCEVO_1947_EN
8 Switching on
The automatic pre-heating (De-Ice) process
could be started whenever the device is
switched on and the ambient temperature
is below 0°C (+32°F). The procedure is
necessary to guarantee correct operation
of the devices even at low temperatures.
The duration ranges depending on
environmental conditions (from 60 minutes
up to 120 minutes).
The unit is switched on by connecting the power
supply.
To switch off the unit disconnect the power.
8.1 First start-up
Make sure that the unit and other
components of the installation are closed
so that it is impossible to come into contact
with live parts.
Make sure that all parts are fastened down
firmly and safely.
23