Refilling and repetitions of the mixing program
✓ The | Fill | program step is executed, then the steps previ-
ously executed (2 to 4) are repeated three times.
Note! As soon as program step 13 | Fill | starts, the suc-
tion hose of the disposal vehicle must be disconnected
from the Storz B coupling. Fresh water is pumped into the
disposal vehicle if the suction hose of the disposal vehicle
is removed too late.
✓ Disposal procedure is completed.
40 / 148
016-190_01