Assembly instructions
3.6. Mounting the pent roof
Mount the left and right pent roof elements. Remove the upper diagonal block
planks to put in the block planks at the front.
3.7. Assembling the threaded rods
Connect the threaded rods with each other as shown in the picture and push
them down into the holes provided for them in the block planks.
Screw the flange on the top and fasten the washers and nuts on the bottom.
Then mount the middle pent roof element and its threaded rod.
Prepare the holes for the technical systems (sauna heater, control unit etc.).
3.8. Assembling the sauna roof elements
Install the roof support slats.
Put in the roof elements.
Carry out the electrical installation - pull in the cables!
If the roof elements are screwed together from above, it will not be possible
to access the roof space later. An inspection opening for the equipment
may then have to be cut in the roof gable.
3.9. Installing the outer roof
Place the rafters in the recesses as illustrated and screw them to the block planks.
Attach the tongue-and-groove boards to the rafters - start at the back. Gently
knock the boards together and nail them to the rafters. Make sure the boards
are consistently parallel.
The roof boards must be flush with the rafters at the front and back - shorten
the boards if necessary.
3.10. Covering the roof
Start laying the roofing felt as illustrated on the lower side of the roof
(40 mm overhang).
Mount the roof edge boards and roof edge trims.