Preparing For Installation; Important Note - Sentiotec LAVA Instructions De Montage

Masquer les pouces Voir aussi pour LAVA:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Assembly instructions

1. Preparing for installation

Read these assembly instructions carefully and keep them within reach. So that
you can look up product information at any time.
These assembly instructions can also be found in the downloads sec-
tion of our website: www.sentiotec.com/downloads.

1.1. Important note

● Check with your local planning authority (municipal office, magistrate)
with respect to the building regulations and load standards.
● A solid concrete foundation is important for the durability as well as
the safety of your outdoor sauna. We recommend having the foundation
laid by a specialist.
● The anchoring of the outdoor sauna is the responsibility of the customer.
No warranty in the event of damage.
● The outdoor sauna is delivered by lorry (also possible by semi-trailer truck).
Access to the unloading area must be ensured.
● Before you begin work, check the parts list to ensure that all the individual
parts have been delivered. If you discover any missing parts, notify your
dealer within 14 days of receiving the sauna cabin.
● Keep the delivery note, the invoice and the assembly instructions in a safe
place in case of any questions.
● You need an assistant for the installation.
● All screw fittings must be pre-drilled.
Attention!
The electrical connection may only be performed by a qualified
electrician or similarly qualified person.
● The roofing felt included in the scope of delivery serves as an initial roofing.
We also recommend covering the roof with bitumen shingles, sheet metal
or a suitable foil.
● Wood is a natural product that can swell, shrink or warp, despite good stor-
age. For this reason, some force may be necessary during the installation.
p. 3/10
EN

Publicité

Table des Matières
loading

Table des Matières