Hydraulic Connection Diagrams - Baxi BPI-Eco 1.250 Mode D'emploi

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

4.8

HYDRAULIC CONNECTION DIAGRAMS

4.8. 1
Open expansion tank system (fig. 9)
BPI-Eco
4.8.2
Closed expansion tank system and safety exchanger with thermostatic valve (fig. 10)
BPI-Eco
KEY
VE Open expansion tank
VS System safety valve 3 BAR - 1/2"
VM Mixing valve
VR Check valve
PI System pump
IR Heating system
KEY
VE Expansion tank
VS System safety valve 3 BAR - 1/2"
VM Mixing valve
VR Check valve
PI System pump
IR Heating system
VT Thermostat valve
SC Safety exchanger
F Filter
CAUTION: The safety exchanger is supplied in an
optional kit code 8105200/01.
Temperature of the water supplied to the safety
heat exchanger: 10°C.
Pressure of the water supplied to the safety
heat exchanger: 2 bar.
Assembly of the safety heat exchanger (SC) is
mandatory.
Before commissioning the boiler, ensure that
the water flow of the thermostatic valve is gua-
ranteed (VT).
Fig. 9
Fig. 10
35

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Bpi-eco 1.350Bpi-eco 1.450Bpi-eco 1.550Bpi-eco 1.650

Table des Matières