Fill the counterframe with cement. The plate must be perfectly level with the screw threads completely on the surface.
Allow to cure for at least.
Remove the counterframe and fill the hole around the block of cement with earth.
24h
Remove the nuts and washers from the screws.
Insert the electric cables in the tube until they protrude by approximately 600 mm.
Securing the gearmotor
Remove the inspection hatch using the customised key. Unscrew the side screws and lift the cabinet out of the gearmotor.
3
2
1
1
2