Step 2:
• Install 2 x 38mm tube plugs (14) and 1 x 25 tube plug (16) and spring
clip (19) on G1 and G2.
• Install H and I on G1 and G2 with 1 x M8x20 bolt and washer (9) and 1
x M10x20 bolt and
washer (6).
• Install 25 x tube plug (16) and 2 x foam rollers (22) on H.
• Install 2 x grip handle covers (21) on J1 and J2.
• Install J1/J2 on A with 1 x lock catch (25) and triangle handle (23).
21
23
25
9
14
22
6
16
19
16
20
~ 7 ~