Step 7: Installation of the up raising control part:
• Fix the gourd buckles (27) on the two ends when using the cable (V).
The gourd buckle connects the shoulder rest (U) and the cable (V).
• Fix the angle of the backrest with the popper pin (26).
27
27
26
~ 12 ~