Barrette rdi FINYL LINE Mode D'emploi page 5

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

5.
SNAP BALUSTERS INTO YOUR BOTTOM
RAIL
a. Each kit with vinyl balusters contains 2 tabbed
balusters. Space them evenly into each
section.
b. Push all balusters into bottom rail (Fig.10).
NOTE: Finyl Line top rails are reinforced with an
aluminum channel. Please check the inside of
your top rail prior to installation. If it uses a shape
other than a capital "H", then be sure to orient
that rail so the long part of the aluminum faces
the Inside of the deck (Fig. 11).
6.
INSTALLING TOP RAIL
a. Place brackets onto both ends of top rail
b. Begin at one side of rail and align first baluster
with first routed hole on bottom side of top rail
and snap top rail into position (Fig. 12).
c. Continue down the line of balusters installing
balusters into top rail.
d. Install brackets:
i. Make sure rails are fully seated with
balusters and level and centered to post
sleeve. Then, using
first top bracket screw hole (Fig. 12). Drill
through bracket hole, vinyl post sleeve and
vinyl insert and loosely install first
#10 x 1
ii. Repeat pre-drilling process for
remaining three screws (Fig. 13).
iii. Tighten screws until the bracket is snug
iv. Repeat steps i-iii for the second
top bracket.
1
8
" screw.
1
2
with the post. We recommend a non-
impact drill with a clutch setting to avoid
over tightening (Fig. 14).
" drill bit, pre-drill
Fig. 10
Fig. 11
Any
Side
Deck
Side
Fig. 12
5

Publicité

Table des Matières
loading

Table des Matières