Barrette rdi FINYL LINE Mode D'emploi page 10

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

STAIR RAIL INSTALLATION
FINYL LINE T-TOP STAIR RAILING CAN BE INSTALLED WITH THREE
METHODS/OPTIONS
I. Using pre-molded brackets
II. Using adjustable "Swivel" brackets
III. Using field cut angle brackets
1.
POST INSTALLATION
Closely follow Post Install Kit installation
instructions or use a Post Sleeve on an existing
wood 4x4.
2.
DETERMINE SPACING
Temporarily secure a deck board (
stair treads to determine the spacing between
the nose of the stairs and your bottom rail (Fig. 1).
NOTE: Finyl Line top rails are reinforced with an
aluminum channel. Please check the inside of
your top rail prior to installation. If it uses a shape
other than a capital "H", then be sure to orient
that rail so the long part of the aluminum faces the
Inside of the deck (Fig. 2).
3.
ASSEMBLE YOUR STAIR RAILING
SECTION
a. Each kit with vinyl balusters contains 2
tabbed balusters. Space them evenly into
each section.
b. Assemble your stair railing section by
snapping balusters into bottom rail (Fig. 3).
10
") to your
5
4
Fig. 1
Temporary
Temporary
Deck Board
Deck Board
Fig. 2
Any
Side
Deck
Side
Fig. 3

Publicité

Table des Matières
loading

Table des Matières