Illustrations Used - Abicor Binzel MB EVO PRO Traduction Du Mode D'emploi D'origine

Masquer les pouces Voir aussi pour MB EVO PRO:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 46
4 Commissioning
Type
Type of cooling
15
Air
25
Air
24
Air
26
Air
36
Air
240 D
Liquid
401 D
Liquid
401
Liquid
501 D
Liquid
501
Liquid
Tab. 2
Product-specific torch data (EN 60974-7)
Cooling data
Flow temp.
Max. 40 °C
Flow
Min. 1.5 l/min
Flow pressure
Min. 2.5 bar/max. 3.5 bar
Tab. 3
Cooling data/cable assembly
3.2

Illustrations used

All illustrations can be found at the beginning of the operating instructions.
4
Commissioning
DANGER
Risk of injury due to unexpected start
Turn off the entire system prior to assembling, disassembling or servicing parts of the device.
• Close all supply lines.
• Disconnect the electrical power supply.
DANGER
Risk of injury and device damage when handled by unauthorized persons
Improper repair work and modifications to the product may lead to serious injuries and damage to the device. The product warranty will be rendered invalid if
work is carried out on the product by unauthorized persons.
• Only qualified personnel are permitted to perform work on the device or system.
Carry out all steps in the specified sequence.
4.1
Preparing the welding torch for installation of the cable assembly
1 Switch off the power source and unplug the power plug.
4.2
Equipping the torch neck
The MIG/MAG manual welding torches are fully equipped upon delivery.
Information about replacing wear parts and about the wire guide can be
found here:
4.3
Connecting the cable assembly, fig. A
1 At the wire feeder: insert the central plug in the connecting socket.
2 At the wire feeder: secure the cable assembly with the connection nut.
3 Coolant: connect the flow line (blue) and return line (red).
• Check the coolant's minimum fill level.
4.4
Purging the coolant circuit, fig. B
1 Place the collection receptacle below the coolant return connector (red).
2 Loosen the coolant return hose at the coolant recirculator and hold it over
a collection receptacle.
EN - 28
MB EVO PRO
Load
CO
M21
CO
2
2
A
A
A
-
-
180
180
150
150
230
200
230
250
220
250
270
240
270
320
290
320
325
300
300
450
400
400
475
425
450
550
500
500
575
525
550
MB EVO
Duty cycle
Load
M21
A
%
180
35
150
60
200
60
220
60
240
60
290
60
270
100
350
100
400
100
450
100
500
100
Cable assembly
Standard length L
Coolant connection
Cooling device output
Control lead
2 Switch off the gas and compressed air connector.
 8 Maintenance and cleaning on page EN-29
• Recommendation: use ABICOR BINZEL BTC coolant.
• To prevent damage to the welding machine, do not use deionized or
demineralized water.
• Purge the coolant circuit the first time the equipment is commissioned and
with every cable assembly replacement.
3 Seal the opening on the coolant return hose. Open and close it multiple
times. Repeat this process until the coolant flows into the collection
receptacle continuously and without air bubbles.
MB EVO PRO/MB EVO
Wire 
Gas flow rate
mm
L/min
0.6–1.0
10–18
0.8–1.2
10–18
0.8–1.2
10–18
0.8–1.2
10–18
0.8–1.2
10–20
0.8–1.2
10–20
0.8–1.6
10–20
0.8–1.6
10–20
1.0–1.6
10–20
1.0–1.6
10–20
3.00 m, 4.00 m, 5.00 m
Plug-in nipple with nom. diam. 5
Min. 800 W
2 lead

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Mb evo

Table des Matières