Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

INSTALL THE DUCTWORK
NOTE: To reduce the risk of fire, use only
metal ductwork.
1. Decide where the ductwork will run between
the hood and the outside.
2. A straight, short duct run will allow the hood
to perform most efficiently.
3. Long duct runs, elbows, and transitions will
reduce the performance of the hood. Use
as few of them as possible.
4. Install a roof or wall cap. Connect 6" round
metal ductwork to cap and work back to-
wards hood location. Use duct tape to seal
the joints between ductwork sections.
INSTALL MOUNTING
BRACKETS
1. Construct wood wall framing that is flush
with interior surface of wall studs.
Make sure:
a) the framing is centered over installation
location.
b) the height of the framing will allow the
mounting brackets to be secured to the
framing within the dimensions shown.
2. After wall surface is finished, secure
mounting brackets to framing using
dimensions shown.

INSTALL THE HOOD

1. Hang the hood from the brackets through
the rectangular cut-outs on the back of the
hood. Cut-outs are larger than the brackets
to allow for horizontal adjustment.
The bottom of the hood should be 24" to 30"
above the cooking surface.
2. Height adjustment screws provide vertical
adjustment.
3. Depth adjustment screws provide
horizontal adjustment.
4. Secure the hood with mounting screws
(4.8x38mm). Use drywall anchors, provided,
if wall studs or framing are not available.
All manuals and user guides at all-guides.com
- 6 -
ROOF CAP
DECORATIVE
FLUE
HOOD
24" TO 30" ABOVE
COOKING SURFACE
FRAMING BEHIND DRYWALL
5
5/16"
5
5/16"
X
= min 30-3/8" - max 36-7/16"
above cooktop
MOUNTING
RECTANGULAR
SCREWS
CUTOUTS
(4.8x38mm)
WALL
FRAMING
DEPTH ADJUSTMENT SCREWS
HEIGHT
ADJUSTMENT
SCREWS
MOUNTING SCREWS (4.8x38mm)
6" ROUND
DUCT
WALL
CAP
6"
ROUND
ELBOW
2
3/16"
X
MOUNTING
BRACKETS

Publicité

Table des Matières
loading

Table des Matières