WAGNER ProSpray 27 Mode D'emploi page 42

Groupe de projection à haute pression
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Repairs at the unit
11.3 Packings
1. Remove inlet valve housing and lower housing as
described in Chapter 11.2, Page 38.
2. It is not necessary to remove the outlet valve.
3. Push up spiral ring (Fig. 16, Item 1) with screwdriver.
Remove connection pin (2) with a diameter of 6 mm
from the connecting rod (3) and piston (4).
4. Remove connection pin (2) from the gear unit hou-
sing.
5. Loosen lock nut (5) counterclockwise with light blows
from a hammer.
6. Unscrew upper housing (6) counterclockwise from
the gear unit housing.
7. Clamp upper housing (6) at the wrench surfaces ver-
tically in a vice.
Do not tighten vice excessively to
prevent crushing.
Attention
8. Screw out threaded joint (7).
9. Push piston (4) downward out of the upper housing
(6). Check piston for wear and replace if necessary.
10. Remove upper packing (8) and lower packing (9)
from the upper housing (6).
Do not damage inside of upper
housing.
Attention
40
All manuals and user guides at all-guides.com
g
11. Remove the transportation devices from the upper
The transportation device from the upper packing is re-
12. Lubricate upper packing (8) and lower packing (9)
3
1
5
7
10
8
6
9
11
4
and lower packings.
quired for installation of the piston.
with machine grease.
2
ProSpray 27 • 31

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Prospray 31

Table des Matières