Cable Connection - Midea COOLIX MSC2-12HRDN1-QE Instructions D'installation

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 77
note
Note in the sense of EMV Guideline 89/336/EWG: To prevent the flicker effect when starting the condenser (technical proc-
ess), apply the following installation criteria:
·
The air conditioner must be connected to the main power supply. The supply must have a low impedance; normally it
is reached with at the melting point of 32 A.
·
No other electrical appliances may be connected to the same power supply line.
·
For more information about correct installation, contact the power company and make sure that there are no restrictions
for the installation of products such as washing machines, air conditioners, and electric stoves.
·
Please read the operating data on the product for information about the supply of the air conditioner.

cable connection

·
Both connecting electrical cables must be connected through the mounted plug-coupling combination on the outdoor
unit. However, this cannot be performed until the coolant lines have been connected.
·
Remove the safety cap from the electric connection of the outdoor unit.
·
Remove both screws from the pull relief.
·
Now connect the plug from the indoor unit to the coupling on the outdoor unit.
·
Place the electric cable under the pull relief and screw the two loosened screws back in.
·
Reinstall safety cap for the electric connection of the outdoor unit.
staRt-up
Plug in the power plug on the indoor unit. The air conditioner is now ready for operation. Perform the start-up as described
in the operating instructions.
·
Run the test operation after checking for gas leaks in the area of the adapter connections and after testing the electrical
components.
·
Connect the appliance to the power supply and press the "COOL" button on the remote control to start the test.
·
Check all functions.
·
Due to a safety function, the air conditioner will not start until 3 minutes after start-up or switching the switch.
·
Make sure that the switch is set to OFF after the test operation.
All manuals and user guides at all-guides.com
EN
Screw the cable into
the pull relief
Connect the indoor unit to
the power supply
Press "COOL" on the remote control
during test operation.
39

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Coolix msc2-18hrdn1-qe

Table des Matières