TUBING AND COMMISSIONING

• Connect the tubes to the thread inputs marked with IN and OUT
• The other thread input must be closed by the screw plug:
• Now fill the Eisball with a funnel through the upper fillport. The optimal filling height is
10mm below the upper fillport opening:
10 mm
Alphacool International GmbH
We only recommend clear coolants
from our own production (CKC or
Eiswasser Crystal - no UV!) or pure
distilled or osmosis filtered water.
After commissioning the pump for the
first time, the water level drops.
Therefore, liquid should be refilled
during use.
24
Use the screw tool.