Tubing And Commissioning - Alphacool EISSTATION DC-LT-SOLO TOP Mode D'emploi

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Eisstation DC-LT – Solo Top
Alphacool International GmbH

TUBING AND COMMISSIONING

• Connect the tubes to the thread inputs marked with IN and OUT
• For this setup the G1/4'' inlet on top must be sealed:
Use the plug key
• You can also use the thread on top as an inlet. For this configuration, close the side inlet:
23

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

15372

Table des Matières