5. Installation

• Please follow the safety instructions contained in this document during installation!
• Installing and operating the stations incorrectly will invalidate any warranty claims.
• Hazards resulting from adjoining masonry components must be avoided.
Free access to the station and connection lines must be ensured.
• Make sure the connection to the station is tension-free.
The interface stations are available in two variants according to the space available and structural conditions:
Type C: 430 x 500 x 200 mm (W x H x D)
Type C1: 365 x 500 x 245 mm (W x H x D)

5.1 Primary heating connection (installation of the station on the riser line)

• Installing the station in the lines:
Observe a 500 mm construction height and
line spacing of x with SL/RL (=VL/RL) lines
Type C: x =170 mm, depth of the station: 160 mm
Type C1: x = 90 mm, depth of the station: 243 mm
• The station has 1 ½"
flat sealing connections with union nut at both the
top and bottom.