7. Station completion
7.1 Installation of the heat flow meter
The heat flow meter must only be installed once the entire heating system has been flushed through.
LogoPack stations are fitted with an adapter (L = 110 mm ¾") for a heat flow meter that must be removed before the heat flow meter is
installed.
Procedure:
• Close all shut-off valves "A" in the station.
• Lower the system pressure by opening the bleeding devices "B".
• Release the screw fittings on adapter "C".
ATTENTION: The station can be emptied (using the boiler filling
and drain valves provided if necessary).
• Remove the adapter and insert the heat flow meter and screw in
place. NOTE: Bear in mind the direction of flow.
Do not forget the seals.
• Remove the ½" plug "D" on the flow distributor and screw in and
seal the heat flow meter supply sensor.
• Once the work is complete, use the bleeding devices to re-open
the shut-off valves and station. Check for leaks.
7.2 Hot water throttle
LogoPack stations are fitted with a hot water throttle "G" in the PF
controller connection piece. The model with gasket simplifies the
exchange process. The following throttle plates can be used as
required:
10 I/min: Colour code - blue
12 I/min: Colour code - red
15 I/min: Colour code - green
17 I/min: Colour code - brown
Details:
Sensor mounting
25