Commissioning; Zone Valve (Dwelling Heating Circuit) - meibes LogoPack C Mode D'emploi

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

8. Commissioning

Commission the station once it has been flushed and filled and a pressure test has been carried out.
All heating and sanitary installations must be complete.
Bleed the station every so often during the commissioning process (bleeding devices: cf. Kapitel 7.1).
Please observe the instructions, benchmarks and settings for the control fittings specified in our service log when commis-
sioning.

8.1 Zone valve (dwelling heating circuit)

Position 5 – "Hydraulisches Schema" on page <?>
• Close the valve presetting ring by rotating it to the right with a flathead screwdriver
(this position corresponds to the "zero setting").
• Take the setting for the desired heating volume flow from the design documents and adjust with a flathead
screwdriver.
Reference value diagram for adjusting the zone valve: Kvs =1.85
Setting curves for the zone valve settings in numbers and degrees
2 rotations = fully open = number 20 or 720°
0,30
1 (36°)
1 (36°)
0,25
0,20
0,15
0,10
0,05
0,00
0,00
50,00
100,00
Please observe the separately provided installation instructions when installing the optional dwelling controller! 9. Optional
V117.XLS
26
Einstellkurven für das Zonenventil
Einstellungsangaben in Merkzahl und Grad (2 Umdrehungen = voll geöffnet = Merkzahl 20 bzw. 720
1,5 (54°)
2 (72°)
2,5 (90°)
150,00
200,00
250,00
300,00
350,00
3 (108°)
3,5 (126°)
4 (144°)
400,00
450,00
500,00
550,00
Volumenstrom [l/h]
°)
5 (180°)
6 (216°)
7 (252°)
8 (288°)
9 (324°)
10 (360°)
11-20 (720°)
600,00
650,00
700,00
750,00
800,00
18.06.2014

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Logopack c1

Table des Matières