PTB 03 ATEX 1030 X
DANGER!
Danger of high voltage!
Acute risk of injury from hazardous structure-borne voltage!
Risk of damage to the device due to short circuit!
•
Before starting work, switch off the power supply and secure to
prevent it being switched on again!
•
Live terminals in the terminal box can cause electric shock, short
circuit or explosion. Switch off the power supply before open-
ing the terminal box.
•
The connecting cables to the electromagnets must be secure,
and be laid so that they are adequately protected from mecha-
nical damage.
•
Observe the applicable accident prevention and safety regulati-
ons for electrical devices!
WARNING!
Danger - high pressure!
Interventions in the pneumatic system represent an acute risk of
injury.
•
First switch off pressure before disconnecting lines and valves
•
Observe the flow direction during installation
•
Observe the applicable accident prevention and safety regulati-
ons for pneumatic systems.
Installation
.
8.2.
installation of the Type 0780
Installation in any position.
Preferably with solenoid system mounted at the top.
1.
Clean the pipe runs.
2.
Installation in any position.
→
Preferred direction with drive mounted at the top
3.
Connect a dirt-trap (strainer) upstream
→
Note the direction of flow
4.
Seal.
→
PTFE
5.
Screwing on the pipe run.
→
Note the direction of flow
6.
Installation / Dismounting
NoTE!
note for units with connecting cable.
The connecting cable and the coil are moduled together. They
.
must not be dismantled!
Always connect the earth conductor!
7.
Make electrical connections.
.
.
!
!
english
17