Operation; Operating Elements; Putting Out Of Operation - Abicor Binzel MF1 Mode D'emploi

Entrainement maitre avec transmetteur de valeur reelle
Masquer les pouces Voir aussi pour MF1:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

7 Operation

7 Operation
NOTICE
• The device may only be operated by qualified personnel (in Germany see TRBS 1203).
• Before connecting the cable assembly to the wire feeder, check whether the proper wire guide (liner

7.1 Operating elements

1
2
Fig. 8
Symbol

8 Putting out of operation

NOTICE
• As the MF1 frontdrive is integrated into a welding system, putting out of operation depends on the
1 Switch off the robot control.
EN - 14
or PA liner) in accordance with the wire diameter and wire type has been inserted.
1
5
Gas test trigger (black)
3
CAT socket
Operating elements
Designation
Inching trigger (green) (3) Fig. (8) Press trigger once, wire is fed.
Gas test trigger (black) (1) Fig. (8). Press trigger for gas flow.
Connect CAT socket (2) Fig. (8) to helix cable of the CAT EMERGENCY STOP
safety cut-out. Integrated control lead will transmit signal to peripheral units.
Connection of cable assembly control lead(3) Fig. (8). Connect cable assembly
connection plug to connection of cable assembly control lead (3), establishing
signal transmission.
4-pin control lead connection (5) Fig. (8). Connect cable assembly connection
plug to connection of cable assembly control lead (3), establishing signal
transmission.
robot control system. Please make sure that the shutdown procedures for all components integrated in
the welding system are strictly observed.
4
Connection of cable assembly
4
control lead
5
MF1
2
3
Inching trigger (green)
4-pin control lead connection

Publicité

Table des Matières
loading

Table des Matières