Risk Of Injury; Connector Assignment Of Control Lead En - Abicor Binzel MF1 Mode D'emploi

Entrainement maitre avec transmetteur de valeur reelle
Masquer les pouces Voir aussi pour MF1:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

MF1

Risk of injury

Bodily harm caused by the beginning of the wire.
• Keep process-side drive away from the body.
1 Connect the cable assembly to the interface (6) and lift off the protection cap. Connect the control leads
to the frontdrive MF1.
2 Rotate the eccentric bolt (3) and remove it upwards.
3 Open the pressure rocker (8).
4 Press the inching trigger (7) until wire (5) becomes visible.
5 Introduce the wire (5) into the wire guide speed sensor (2) (and on retraction into the torch) and feed it
through the wire guide speed sensor (2) using the inching trigger (7). When doing so, open the pressure
lever (1) for the wire actual value encoder (9).
The contact pressure of the wire actual value encoder (9) is pre-set for wires from 0.8 to 1.2 mm.
6 Close the pressure rocker (8) and insert the eccentric bolt (3).
7 Press the inching trigger (7) until wire (5) emerges from the torch neck.
6.3 Connector assignment of control lead
Fig. 7
CAUTION
Connector assignment of control lead
6 Putting into operation
EN - 13

Publicité

Table des Matières
loading

Table des Matières