Tension Mast; Install Steering Wheel; Cover Of The Upper Deck - Reely Triumph ARR Notice D'emploi

Modèle de vilier
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

i) Tension Mast
As shown in figure 10, each tension rope is already
applied with a number ex works.
Figure 11 shows where the rope has to be attached
(e.g. rope with number 3 to position 3 at the fuselage).
Once all ropes are attached to the correct position and
closed correctly, all ropes must be tensioned with the
integrated tensioners so that the mast will not bend in
any direction while the sail that catches the wind in
operation cannot tip or twist in one direction.
After the mast is tensioned, the tensioners of the
mainsail and head sail have to pull the sails up tensely.
j) Install Steering Wheel
The scope of delivery includes a double steering wheel
(1). This steering wheel must be pushed into the
prefabricated holes in the boat deck and glued on there
with a little 5-minute epoxy resin.
k) Cover of the Upper Deck
The boat body is open in the cabin area for installation of the receiver system and can be closed with a matching cover
by rubber band.
Attention!
Never drive with the boat deck open. For use with high waves and/or slants, the cover additionally needs to
be sealed with a few strips of transparent adhesive tape.
Figure 10
Figure 11
Figure 12
35

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

40 56 23

Table des Matières