External Voltage Supply; Replacement Of Fuses; Installation Notes - Parker Senso Control SCE - 0 20 Mode D'emploi

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 85
5.3

External voltage supply

In case a 220 VAC voltage is required, the external power supply unit
SCSN – 410 must be used. The installation is effected on a TS35/
TS32 mounting rail. The instrument must be wired separately.
Please note:
Please observe the installation instructions of the power
supply unit (product information 1077). Improper handling
can lead to the destruction of the power supply unit and
the subsequent functional units.
5.4

Replacement of fuses

The SCE-020 is equipped with an SMC fuse (Type OMF 63 /
500 mA). We therefore recommend that the instrument be sent in for
a fuse replacement, so that the fuse can be expertly replaced.
5.5

Installation notes

In order to avoid disturbing influences on the data lines of the
instrument, the data lines should be laid in a shielded model.
Analog input and output lines are to be laid shielded in
principle.
Data lines are to be laid at a safe distance from high-
voltage lines.
The instrument must be connected to the protective earth
(PE) via the protective earth terminal.
Should no PE be available in the system, then the PE
terminal must be connected with the GND terminal
through a wire jumper (PIN 8 = GND + PIN 10 = PE ).
- 30 -

Publicité

Table des Matières
loading

Table des Matières