Installation
I
NOTE
The panelling can only be fitted once the refrigerant lines and the cables
(chapter "Connecting the compressor unit to the evaporator unit" on page 18)
have been connected.
6.5
Connecting the compressor unit to the evaporator
unit
A
NOTICE!
Before fastening the connection couplings, make sure that the sealing and
thread faces are absolutely clean. Any contamination will result in a malfunction
of the air conditioner.
➤ Install the connection line for the compressor unit and insert it in the
compressor unit.
I
NOTE
Make sure that the coupling half with the thin capillary tube is not twisted or
kinked.
When tightening the coupling halves, it is essential that you use a second open-
ended spanner to hold the other part.
➤ Connect the rear coupling halves (thick refrigerant line) (fig. 5, page 7) with
each other and tighten them hand-tight ¼ revolution with an open-ended
spanner.
➤ Connect the front coupling halves (thin refrigerant line) (fig. 6, page 7) with
each other and tighten them hand-tight ¼ revolution with an open-ended
spanner.
➤ Install the protective cover underneath the coupling and secure it with the lid
supplied.
➤ Fasten the thick refrigerant line with the supplied pipe clip, the M6 x 16 mm
hexagon head bolt, the M6 U washer and the M6 retainer nuts (fig. 7,
page 8).
Observe the following instructions when installing the supply lines:
• Also observe the installation instructions for the evaporator unit.
• The maximum cable length between the evaporator and compressor unit is:
– SP950T/SPX1200T: approx. 4.2 m
– SP950I: approx. 2.3 m
– SPX1200IC: approx. 2.1 m
18
CoolAir SP950C/SPX1200C
EN