Télécharger Imprimer la page

EdilKamin ECOIDRO Installation, Usage Et Maintenance page 41

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 42
CHECK LIST
Read the entire specifications before using this list
Installation and setup
- Installation carried out by the Dealer which has issued the guarantee and maintenance booklet.
- Room ventilation.
- The smoke duct/flue only receives smoke from the stove.
- The smoke duct has:
- no more than 2 bends.
- a horizontal section of no more than 2 metres.
- a vertical section of at least 1.5 metres.
- the outlet pipes are made of a suitable material (stainless steel is recommended).
- where pipes cross any flammable materials (e.g. wood) all precautions have been taken to avoid fire.
- Hydraulic system declaration of conformity with L. 46/90 (ex-Ministerial Order 37) for Italy and local laws for other countries.
- The heatable room dimensions have been suitably calculated considering the heating efficiency of the heat emitting units (radiators).
Use
- The pellets (6 mm diameter) used are good quality and not damp.
- The combustion chamber and ash pan are clean and have been placed correctly.
- The cleaning rods are operated every day.
- The heat exchange pipes and parts inside the firebox are clean.
- The pressure (read on the gauge) is about 1 bar.
REMEMBER TO VACUUM-CLEAN THE COMBUSTION CHAMBER BEFORE EACH IGNITION.
If ignition fails, do NOT repeat ignition before emptying the combustion chamber.
41

Publicité

loading