Télécharger Imprimer la page

EdilKamin ECOIDRO Installation, Usage Et Maintenance page 31

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 42
Ceramic covering parts
Parts of the stove covering ceramic.
Covering parts list:
- 12 side tiles (95)
- top tiles: right and left
- ceramic shelf (43)
- the aluminium fastening bar is included in the stove packaging
and NOT with the ceramic tiles (117)
Covering assembly
After installing the stove correctly, proceed as follows
WITHOUT removing the top.
Side tiles.
Fit each part (95) in the groove provided in the support bar, star-
ting from the bottom.
Place the rubber pads provided between the parts (96)
After fitting six tiles on one side, push the fastening bar into
place to fasten them (117).
Do the same on the other side.
Top tiles
The two ceramic top parts (right and left) simply rest in the
grooves provided.
Ceramic shelf
(43)
Open the stove door. Remove the two panel screws. Insert the
shelf in the grooves and USE SILICONE to fasten it.
Metal covering parts
Do the same as for the ceramic tiles, but insert metal side parts
instead.
The numbers refer to the exploded view on page 122-123-124.
The same exploded view shows the code numbers for ordering.
Attention:
When the stove is ignited for the first time, open
the valve (V) found below the top plate, so as to
bleed off the air/water.
Insert the tube (T) supplied into the spout of the
bleed valve and open the valve with a screwdriver
until all the air is let out.
95
96
95
117
96
95
96
96
34
35
32
40
34
33
117
35
43
41
31

Publicité

loading