Example And Construction Of The Model - meibes BigFixLock Documentation Technique Mise En Service

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

2. Example and construction of the model

Calculated total flow:
Maximum number of heating circuit outlets:
Calculated from the total from item B
A
C
D
E
34
1
When using the pump groups from DN 40, select the
desired intersection to the heating circuit (see point 8.5).
Size corresponding to the DN of the FL-group*
2
Selected pumps groups
2.1 Reduction set when using V-groups 66305.50
3
Shut-off set with insulation for V-MK group 66833 EWI*
4.
Heat generator
5.
Intersection 66259.695
6.
Boiler guard 66374.100
7.
Intersection 66258.831
8.
Distributor 66457.2
*
Additional corresponding BigFixLock elbow and meter
installation fitting available as an optional extra
**
Additional optional shut-off sets according to the price list for
V-groups (UK/MK) and FL-groups (UK/MK).
28 m
/h
3
2 Kreise
Description
Volume flow
2-circuit module
30 m
3
/h
(inkl. 2 Kupplungen und Enddeckeln)
Description
Volume flow
Boiler guard 700 kW
30 m
/h
3
Description
2x reduction connector including
insulation DN100
Description
BigFixLock flange PN 6 without insulation
Pipe ø
Art. no.
168.3
66457.2
Pipe ø
Art. no.
114.3
66374.100
Pipe ø
Art. no.
168.3 x 114.3
66258.831
Pipe ø
Art. no.
114.3 x DN 100 flange
66259.695

Publicité

Table des Matières
loading

Table des Matières