Télécharger Imprimer la page

Kospel WW Mode D'emploi page 28

Publicité

Les langues disponibles

Les langues disponibles

Connection to the central
heating system
Cylinder must be fitted to the central heating system by pipe unions 1¼"(1" for
double jacket cylinder). A cut off valves must be installed before the pipe unions.
A flow rate of heating water must be high enough to maximise cylinder efficiency
(see technical data table). It concerns the forced circulation installation (with a
central heating pump).
Cylinder need to be placed in that way to ensure the high difference (at least
1,5m) between a heat sources and cylinder. It concerns the gravity circulation
installation.
1
2
3
CO
CW
<
CO
<
Scheme of cylinder connection
[1] - cut-off valve
[2] - safety valve 3bar (max)
[3] - automatic vent valve
[4] - drain valve
[5] - safety valve 6bar (max)
[6] - expansion vessel
28
1
1
1
4
5
[7] - pressure reducer
CW - hot water
ZW - cold water
CO - heating medium
C - circulation
C
<
ZW
<
1
6
7

Publicité

loading

Ce manuel est également adapté pour:

WbWzWpWpzWpw