RK Rose+Krieger RKPowerlift M Notice D'assemblage page 53

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

7.3 Important information on installation and putting into operation
Overhead installation is prohibited. Otherwise, if the profile separates or falls down,
persons could be injured by the load, or the lifting column or other component parts
could be damaged.
It is essential that you note and observe the following instructions. Otherwise, people
may be injured or the lifting column or other components may be damaged.
This lifting column must not have additional drilled holes.
This lifting column must not be used for outside operation.
The lifting column must be protected against moisture penetration.
Each time before the lifting column is put into operation, you must protect the top and
bottom against entry.
When fixing bear in mind that the stand surfaces and contact surfaces must completely rest
on a metal surface that is at least 5 mm thick.
After setting up and putting into operation, it is essential that the mains plug is freely
accessible.
You must not open the lifting column. Observe the safety information attached to the lifting
column.
The user must ensure that there is no danger when the mains plug is inserted.
It must not be possible for the lifting column to fall over in use due to lateral forces.
When designing tables, etc. take care to avoid crushing and shear points. These are to be
protected appropriately.
Possible failure of limit switches must be considered in the construction. Appropriate end
stops are to be installed if necessary. When under tensile load, use a safety guard (for
example, rods or chains), to prevent the profiles from being detached from each other.
Automatic start-up of the column due to a fault is to be stopped immediately by pulling out
the mains plug.
If a power supply cable and/or feed line is damaged, the lifting column is to be taken out of
service immediately.
When the plug is inserted, do not reach into the lifting column. Note the connection
sequence:
1. Plug the power supply cable into the lifting column.
2. Establish the connection to the plug.
7. Life phases
53

Publicité

Table des Matières
loading

Table des Matières