2. Connecting/Disconnecting Handpiece
M500LG M4/B2, M600LG M4/B2
2-1 Connecting
1) Insert the handpiece into the hose connector.
2) Tighten the Hose Nut. (Fig.1)
2-2 Disconnect
Loosen the Hose Nut and pull out the Hose.
SUPPLY AIR PRESSURE Setting
Set the Air pressure at the "Air Check point" on Fig. 1 and Fig. 2 The setting values are on the specification
table. Do not exceed the recommended air pressure by using Multi Gauge.
Multi Gauge: Midwest 4 Hole Order code Z109400 / Borden2/3 Hole Order code Z109200
4
M500LG QD, M600LG QD
2-3 Connecting
1) Insert the Coupling into the Hose Connector.
2) Tighten the Hose Nut.
3) Pull the Connector Ring.
4) Push into the handpiece into Coupling.
2-4 Disconnect
Slide back the Connector Ring as shown in Fig.2.
Air Check Point
Handpiece
Hose Nut
Air Check Point
Connector Ring
Handpiece
Hose Nut
Fig. 1
Fig. 2