Steam Bath Control For On-Wall Mounting - Nordmann Engineering AT4D Instructions D'installation Et D'exploitation

Masquer les pouces Voir aussi pour AT4D:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

4.4.2

Steam bath control for on-wall mounting

36
5. Connect the supply cable according to the specifications in chapter 4.5
to the Nordmann AT4 D, then perform the function control.
6. After successful function control carefully place the touch panel onto
the in-wall housing (make sure the supply cable is not getting pinched).
Then, fix the touch panel to the in-wall housing using the four screw
supplied. Finally attach the decoration foil.
1. At the desired location, mark the four fixing holes with the help of a
spirit level, then drill the holes (ø 6 mm, depth 40 mm) and insert the
dowels supplied.
2 5
9 m
m

Publicité

Table des Matières
loading

Table des Matières