Installation; Unpacking And Checking The Scope Of Delivery; Storing The Unit - Nordmann Engineering AT4D Instructions D'installation Et D'exploitation

Masquer les pouces Voir aussi pour AT4D:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

4

Installation

4.1

Unpacking and checking the scope of delivery

4.2

Storing the unit

Unpacking the unit
Open the packing (cardboard box 248 mm x 248 mm x 100 mm) and check
the delivery for completeness. Please contact your Nordmann supplier in
case something is lacking, they will be glad to send you the missing part
without delay. The standard delivery includes:
Steam bath control for in-wall mounting
Steam bath control complete.
In-wall housing
Decoration foil self adhesive
Plastic bag containing four PT countersunk screws and four nails
Mounting template
Steam bath control for on-wall mounting
Steam bath control complete in on-wall housing
Plastic bag containing four dowels and screws, two cover retaining
straps and one cable gland
Please check the equipment for damage. Please report any damage to your
Nordmann supplier and to the carriers, as required.
Packaging
The original packaging of the Nordmann TP was designed for optimum
safety during transportation. Please preserve the original packing material
in case you once have to return the unit for some reason.
In case you wish to dispose of the packaging, observe the local regulations
on waste disposal. Never dispose of the packaging to the environment.
If the external steam bath control must be stored, store it in a protected
area (best in the original packaging) meeting the following requirements:
room temperature: 1 ... 40 °C
room humidity: 10 ... 80 %rh
33

Publicité

Table des Matières
loading

Table des Matières