Commissioning, Operation - WIKA TR10-0 Mode D'emploi

Masquer les pouces Voir aussi pour TR10-0:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

6. Commissioning, operation

6. Commissioning, operation
6.1 Removal and installation of the measuring insert
When servicing or recalibrating is necessary, make sure that both surfaces of the flameproof
joint (flame path fitting and measuring insert) are not damaged when installing the
measuring insert. Damaged or scratched parts of the flameproof joint must be replaced.
6.2 Electrical connection
Connection to terminal block
For the electrical specifications (e.g. connection diagrams, tolerance values, etc.) please
refer to the data sheets TE 61.01 (for TR10-0) and TE 66.01 (for TC10-0).
Connection to built-in transmitter
For the electrical specifications (e.g. connection diagrams, tolerance values, etc.) please
refer to the relevant operating instructions and/or data sheet for the built-in head-mounted
transmitter.
Junction between Ex d cable gland and connection head
Threads M20 x 1.5: tightening torques 12 Nm
Threads ½ NPT: tightening torques 30 Nm
Junction between cable and Ex d cable gland
Screw the male nut tightly into the adapter (use appropriate tools!)
During installation, take care to
Avoid distorting the cable sheath when tightening the male nut.
Avoid cutting too deep into the cable sheath.
Use suitable cable.
Be careful of the clamping zone of the cable gland.
WIKA operating instructions models TR10-0, TC10-0 (Ex d)
EN
13

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Tc10-0

Table des Matières