4. Verify signal was received by remote module set to
priority one. Follow the test guidelines for each module:
50 Amp Module: Relay contacts will be closed. Relay
and communication LED's will be green. Appliance/load
will have power.
Closed
Low Voltage Module (Single or Dual): Verify
continuity across low voltage control wiring contacts
(A). Communication LED will be green. Appliance/load
will have power.
A
5. Press the TEST button on the Symphony II system
6. Each subsequent press of the TEST button cycles to
Open
7. To return to utility power, turn the utility disconnect
control board. The priority 1 LED and load connected to
remote module set to priority 1 will turn OFF.
50 Amp Module: If off, relay LED status is off.
Communication LED status is green.
Low Voltage Module (Single or Dual): If off, low
voltage communication LED status is green. Continuity
will not be measured across low voltage contacts.
The priority 2 LED (D) and load connected to remote
module set to priority 2 will turn ON. Repeat step 4 for
each priority number being managed.
the next lower priority, through priority 8. After priority
8, press TEST button one time to exit test mode.
The system will reset and be ready to add loads in 5
minutes.
circuit breaker to the "ON" position. All managed loads
will be turned off and turn back on after 5 minutes.
15