Wiring the GRAFIK Eye QS Control Unit (continued):

Line Voltage Wiring Details

• Use properly certified cable for all line
voltage/mains cables.
• Proper short-circuit and overload
protection must be provided at the
distribution panel. You can use up to a
20 A circuit breaker for your installation.
• Install in accordance with all local and
national electrical codes.
• IEC PELV/NECR Class 2 terminals may
be temporarily unplugged for ease of IR,
occupancy sensor, and control wiring.
• Notice: Risk of damage to unit. Do not
connect line voltage/mains cable to
IEC PELV/NECR Class 2 terminals.
Step 1: Install wallbox.
Mount a 3½ in (89 mm) deep 4-gang
U.S. wallbox on a dry, flat indoor surface
that is accessible and allows for system
programming and operation. Allow at
least 4½ in (110 mm) clearance above
and below the faceplate to ensure proper
heat dissipation. Allow 1 in (25 mm) for
faceplate overhang on all sides.
Note: 4-gang wallbox available from
Lutron; P/N 241400.
Faceplate overhangs wallbox
on all sides;
allow 1 in (25 mm)
LUTRON
4
1
in (110 mm)
2
LUTRON
Step 2: Test load wiring.
• Turn power OFF at the circuit breaker or
fuse box.
• Connect a standard light switch between
the live lead and load wire to test the
circuit.
• Turn power ON and check for short or
open circuits. If load does not operate, the
circuit is open. If the circuit breaker trips
(fuse blows or opens), a load short may
exist. Correct short or open circuits and
test again.
Hot/Live
Switch
Neutral
For additional information, see the complete installation and operation guide at www.lutron.com/qs
GRAFIK Eye QS Control Unit Quick Installation and Operation Guide
Step 3: Check control unit wiring.
• Earth/ground terminal connection must
be made as shown in line voltage wiring
diagrams.
• Do not mix different load types on the
same zone.
• Follow all local and national
electrical codes when installing
IEC PELV/NECR Class 2 wiring with line
voltage/mains wiring.
Load
WARNING! Shock hazard. May
result in serious injury or death.
Always turn off circuit breaker or
remove main fuse from power line
before doing any work. Before
connecting the loads to the
GRAFIK Eye QS control unit, test
the loads for short-circuits.
4