Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

064520 BA_TwinsPad.qxp

D User Manual

Multifunctional Solar LED Flood Light
with Double Side Solar Panel
Please read and follow all instructions to operate.
Save this manual for future reference.
INSTALLATION A: WALL MOUNTED
① Check and prepare lamp, accessories and tools well.
② Drill 2 holes of φ8mm with a depth of 60mm and a hole spacing of 167mm, then fix solar panel
on the wall.
③ Drill 2 holes of φ8mm with a depth of 60mm and a hole spacing of 132.5mm, then fix lamp on
the wall.
④ Open the silicon cover at the bottom of lamp, connect the wire of solar panel to the lamp and
screw it tightly.
⑤ Adjust the solar panel and lamp to the right position according local latitude and lighting
direction, then turn on the lamp.
1
4
22.12.20
12:18
Seite 7
8 mm
8 mm
60 mm
60 mm
2
3
5
7

Publicité

Table des Matières
loading

Table des Matières