Installation                                                                       2; Mounting The Second Sun - Algas SDI SECOND SUN Manuel D'utilisation Et D'entretien

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Installation                                                                       2  
 
Install in accordance with NFPA 58 and local applicable codes and 
regulations as required.
Mounting the Second Sun 
Install the SECOND SUN
of the tank. Avoid mounting over weld seams, as this could result in a water leak path. Ensure that the top edge 
cabinet seal is sufficiently compressed to avoid any moisture from entering below. 
Inspect the heater face visually for any damage or gaps in the catalyst material prior to installation. At the same 
time, the tank surface, covered by the heater, should be inspected for corrosion, using the same method for 
inspecting  all  other  exposed  surfaces.  Clean  all  foreign  materials  from  the  pipelines  prior  to  making  any 
connections to SECOND SUN
for leaks using a leak detection solution or device. Eliminate all leaks prior to operation. Make sure to install 
the two J‐hooks as showed below. Incorrectly installed J‐hooks can bend down the top rain guard. See Figure 
1. 
 
 
 
 
 
 
 
 
 
 
1. Attach the provided tank heater mounting cable(s) around the tank as shown in Figure 1 and attach J‐
hooks  to heater cover and tighten so that heater will support itself without slipping on the tank. 
 
2. Level the heater at waist height to facilitate ease of access for mounting. See Figure 2. 
 
8  
 
 
TM
 on a "raised" tank to allow space for the heater to be rotated to the lowest section 
TM
. Use pipe sealant, approved for LPG use, where required. Check all connections 
Fig. 1  
ASDI Operations and Maintenance – Second Sun – P/N 52793 