At The Biginning Of The Seeding Season; Every 50 Working Hours - Gaspardo ALITALIA Emploi Et Entretien

Masquer les pouces Voir aussi pour ALITALIA:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

5.1 MAINTENANCE PLAN - Summary table
INTERVAL
WHEN THE MACHINE lS NEW
AT THE BIGINNING OF
THE SEEDING SEASON
EVERY 8 WORKING HOURS

EVERY 50 WORKING HOURS

EVERY FIVE YEARS
REST PERIODS
cod. G19503392
USE AND MAINTENANCE
ATTENTION: Store the equipment in a dry and indoor place. Should this not be possi-
ble, it is RECOMMENDED to cover it with a rubber cloth paying attention to the electric
devices.
It is advisable to proceed with the following inspections before the machine is set at work
again:
- Check the greasing points and add grease if required.
- Check all bolts and tighten them if necessary..
TYPE OF WORK
only
2
ENGLISH
.
.
1

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

G19503392

Table des Matières