Tubing And Commissioning - Alphacool EISSTATION DC-LT-SOLO TOP Mode D'emploi

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Eisstation DC-LT – Solo Top

TUBING AND COMMISSIONING

In this configuration, the G ¼" inlet on the expansion tank is used as an inlet. The outlet
remains the threaded port marked as OUT on the pump top. Close the inlet at the pump
top with a sealing plug.
Now fill the reservoir using a funnel through the upper fillport:
Alphacool International GmbH
We only recommend clear coolants
from our own production (CKC or
Eiswasser Crystal - no UV!) or pure
distilled or osmosis filtered water.
After commissioning the pump for the
first time, the water level drops.
Therefore, liquid should be refilled
during use.
27

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

15372

Table des Matières