INSTALLATION
Installation
10. Installation
factory settings
Internal anti-scalding protection
Connected load
Connected load options
Standard installation
Electrical connection from below on unfinished walls
Water connection on unfinished walls
For further installation options, see chapter "Alternative instal-
lation methods".
10.1 Standard installation
Opening the appliance
f Open the appliance by holding the fascia at the side and pull-
f
ing forwards away from the appliance cover. Undo the screw.
Pivot open the appliance cover.
f Remove the back panel by pressing the two locking tabs and
f
pulling the lower section of the back panel forwards.
Preparing the power cable on unfinished walls, for connection
from below
160
30
1 Cable entry installation aid
f Prepare the power cable.
f
32
| DHB-E LCD
DHB-E 11/13 LCD
°C
60
kW
13.5
x
DHB-E 11/13 LCD
x
x
Fitting the wall mounting bracket
f Mark out the holes for drilling using the installation tem-
f Drill the holes and secure the wall mounting bracket at 2
f Fit the wall mounting bracket.
Installing the twin connectors
1
f Seal and insert the twin connectors.
DHB-E 18 LCD 25A DHB-E 18/21/24 LCD
60
18
-
DHB-E 18 LCD 25A DHB-E 18/21/24 LCD
x
x
f
plate. If the appliance is to be installed on finished walls, also
mark out the fixing hole in the lower section of the template.
f
points using suitable fixing materials (screws and rawl plugs
are not part of the standard delivery).
f
Material losses
!
Carry out all water connection and installation work in
accordance with regulations.
f
DHB-E 27 LCD
60
60
21
27
x
-
DHB-E 27 LCD
x
x
x
x
www.stiebel-eltron.com